Project Manager, Technical Director
Various locations throughout United States
-Escape rooms are produced from scratch and installed into a space in 7 to 12 days depending on complexity.
-Many of the escape rooms are operated by Programmable Logic controllers and a series of triggers with low voltage wiring connecting the props and providing automation.
Project Manager, Technical Director
Lake Compounce Amusement Park - Bristol, CT
-Build 4 haunted house mazes and 3 scare zones in 10 weeks
-Have all attractions operational for rehearsals and opening weekend
-Manage and Maintain Budget
-Assist and oversee third party vendors
-Create and manage project documentation project schedule, daily reports, punch lists, SOPs, opening procedures, and municipality coordination
Project Manager, Technical Director, Head Carpenter, Master Electrician
Adventureland Amusement Park and Resort - Altoona, IA
-Build 4 haunted house mazes and 3 scare zones in 6 weeks
-Have all attractions operational for rehearsals and opening weekend
-Install lighting, audio, and emergency notification systems
-Maintain Budget
Assistant Technical Director
Milwaukee County Zoo - Milwaukee, WI
-Assist install team in making deadline by troubleshooting and repair scenery and electrical lines.
-Manage crews to efficiently install attraction by deadline
-Troubleshot and repaired wiring on archways, snow machines and RoarChastration tree
-Oversaw installation of redesigned butterfly tunnel-Assisted crews to complete project installation for opening night
Technical Director
Phoenix Zoo, Phoenix, AZ
-Safely bring the 50ft tall, 6,600 lb video tree to the shore.
-Utilize a crane to lift it out of the water and dismantle for safe storage
-Strike the control boxes and associated wiring for the tree and surrounding lights.
-Up to 4 days of available time
-Completed project in two days, ahead of schedule
Technical Director, On-site point of contact
Washington D.C. - Outside Smithsonian Institute Portrait Gallery
-Build and rig star tunnel exit and entrance for holiday season.
-4 day window, to be completed by opening ceremonies
-Accomplished task in one day, ahead of schedule- Client was happy with the product and our work
Owner, Designer, Carpenter
Based in Janesville - Mobile Attraction
-Build Axe Throwing Arena that can be setup and torn down quickly
-Include sales tent and private area, away from public view
-Must fit on 10'x6" trailer and 4'x8' truck bed
-Must be wind resistant
-Must meet WATL rules and guidelines
-Had over 1200 people throw axes across 10 events throughout the summer
Consultant
Waverly Health Center - Waverly, IA
- Create a reflection garden and event space to go on top of the Health Center
- Space needed to be flexible and lightweight, as it was being added to an existing structure.
- I helped to design lighting and sound layouts and choose fixtures that would work well with the space.
Designer, Technical Director
Wartburg College, Waverly, IA - Fieldhouse
- Create a regal backdrop for the commencement ceremonies that were moving indoors for the first time.
- Design had to be reusable from year to year and be installed quickly
Designer, Installer
Mobile Fair Booth Installation designed for Wartburg College
-Design a booth to be quickly setup and torn down for fairs.
-Should contain graphics as backdrop and have TVs for video content to attract visitors
-Needs to have carpet and padding for worker comfort and esthetics
-Needs to breakdown to fit in a 10ft trailer
-Table in center for workers to give out SWAG and storage behind backdrop for SWAG storage
Hans Pregler's Portfolio
Copyright © 2024 Hans Pregler's Portfolio - All Rights Reserved.
Powered by GoDaddy Website Builder
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.